Dealing with construction permits: Quality control after construction in Mauritania
Mauritania: Dealing with construction permits: Quality control after construction was 2 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control after construction in Mauritania, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
Mauritania recorded 2 DB16-20 methodology for dealing with construction permits: quality control after construction in 2019. That is the highest value across all 6 years on record.
That represents a change of unchanged over ten years.
Mauritania ranks 132nd of 183 countries on this measure, in the middle of the range.
Countries ranked near Mauritania
- 129 Nigeria 2.77 DB16-20 methodology compare
- 130 Brazil 2.39 DB16-20 methodology compare
- 131 Mexico 2.17 DB16-20 methodology compare
- 132 Angola 2 DB16-20 methodology compare
- 132 Antigua and Barbuda 2 DB16-20 methodology compare
- 132 Benin 2 DB16-20 methodology compare
- 132 Bolivia 2 DB16-20 methodology compare
- 132 Burundi 2 DB16-20 methodology compare
- 132 Cambodia 2 DB16-20 methodology compare
- 132 Cameroon 2 DB16-20 methodology compare
- 132 Comoros 2 DB16-20 methodology compare
- 132 Democratic Republic of Congo 2 DB16-20 methodology compare
- 132 Congo 2 DB16-20 methodology compare
- 132 Cote d'Ivoire 2 DB16-20 methodology compare
- 132 Dominica 2 DB16-20 methodology compare
- 132 Ethiopia 2 DB16-20 methodology compare
- 132 France 2 DB16-20 methodology compare
- 132 Gabon 2 DB16-20 methodology compare
- 132 Gambia 2 DB16-20 methodology compare
- 132 Germany 2 DB16-20 methodology compare
- 132 Ghana 2 DB16-20 methodology compare
- 132 Grenada 2 DB16-20 methodology compare
- 132 Guinea 2 DB16-20 methodology compare
- 132 Guinea-Bissau 2 DB16-20 methodology compare
- 132 Guyana 2 DB16-20 methodology compare
- 132 Haiti 2 DB16-20 methodology compare
- 132 Iraq 2 DB16-20 methodology compare
- 132 Jamaica 2 DB16-20 methodology compare
- 132 Kenya 2 DB16-20 methodology compare
- 132 Kiribati 2 DB16-20 methodology compare
- 132 Lesotho 2 DB16-20 methodology compare
- 132 Madagascar 2 DB16-20 methodology compare
- 132 Mali 2 DB16-20 methodology compare
- 132 Niger 2 DB16-20 methodology compare
- 132 Poland 2 DB16-20 methodology compare
- 132 Sao Tome and Principe 2 DB16-20 methodology compare
- 132 Senegal 2 DB16-20 methodology compare
- 132 Solomon Islands 2 DB16-20 methodology compare
- 132 South Sudan 2 DB16-20 methodology compare
- 132 Saint Vincent and the Grenadines 2 DB16-20 methodology compare
- 132 Sudan 2 DB16-20 methodology compare
- 132 Suriname 2 DB16-20 methodology compare
- 132 East Timor 2 DB16-20 methodology compare
- 132 Togo 2 DB16-20 methodology compare
- 132 Zambia 2 DB16-20 methodology compare
More private sector data for Mauritania
- Merchandise trade 87.3% (2025)
- Food imports 23.9% (2024)
- Manufactures imports 40.8% (2024)
- Merchandise imports 5.68 billion current US$ (2025)
- Food exports 25.5% (2024)
- Manufactures exports 0.5% (2024)
- Merchandise exports 4.51 billion current US$ (2025)
- Commercial service exports 123.61 million current US$ (2024)
- Transport services 54.2% (2024)
- Computer, communications and other services 41.9% (2024)
Frequently asked questions
- What is dealing with construction permits: quality control after construction in Mauritania?
- Dealing with construction permits: quality control after construction in Mauritania was 2 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control after construction recorded in Mauritania?
- The highest recorded value was 2 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control after construction recorded in Mauritania?
- The lowest recorded value was 2 DB16-20 methodology in 2014.
- How does Mauritania rank for dealing with construction permits: quality control after construction?
- Mauritania ranks 132nd out of 183 countries with data for 2019.
- Is dealing with construction permits: quality control after construction rising or falling in Mauritania?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Mauritania data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.