Dealing with construction permits: Quality control after construction in Antigua and Barbuda
Antigua and Barbuda: Dealing with construction permits: Quality control after construction was 2 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control after construction in Antigua and Barbuda, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
The most recent figure for dealing with construction permits: quality control after construction in Antigua and Barbuda is 2 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.
That represents a change of unchanged over ten years.
Antigua and Barbuda ranks 134th of 185 countries on this measure, in the middle of the range.
Countries ranked near Antigua and Barbuda
- 131 Nigeria 2.77 DB16-20 methodology compare
- 132 Brazil 2.39 DB16-20 methodology compare
- 133 Mexico 2.17 DB16-20 methodology compare
- 134 Angola 2 DB16-20 methodology compare
- 134 Benin 2 DB16-20 methodology compare
- 134 Bolivia (Plurinational State of) 2 DB16-20 methodology compare
- 134 Burundi 2 DB16-20 methodology compare
- 134 Cambodia 2 DB16-20 methodology compare
- 134 Cameroon 2 DB16-20 methodology compare
- 134 Central African Republic 2 DB16-20 methodology compare
- 134 Comoros 2 DB16-20 methodology compare
- 134 Democratic Republic of the Congo 2 DB16-20 methodology compare
- 134 Congo 2 DB16-20 methodology compare
- 134 Côte d'Ivoire 2 DB16-20 methodology compare
- 134 Dominica 2 DB16-20 methodology compare
- 134 Ethiopia 2 DB16-20 methodology compare
- 134 France 2 DB16-20 methodology compare
- 134 Gabon 2 DB16-20 methodology compare
- 134 Gambia 2 DB16-20 methodology compare
- 134 Germany 2 DB16-20 methodology compare
- 134 Ghana 2 DB16-20 methodology compare
- 134 Grenada 2 DB16-20 methodology compare
- 134 Guinea 2 DB16-20 methodology compare
- 134 Guinea-Bissau 2 DB16-20 methodology compare
- 134 Guyana 2 DB16-20 methodology compare
- 134 Haiti 2 DB16-20 methodology compare
- 134 Iraq 2 DB16-20 methodology compare
- 134 Jamaica 2 DB16-20 methodology compare
- 134 Kenya 2 DB16-20 methodology compare
- 134 Kiribati 2 DB16-20 methodology compare
- 134 Lesotho 2 DB16-20 methodology compare
- 134 Madagascar 2 DB16-20 methodology compare
- 134 Mali 2 DB16-20 methodology compare
- 134 Mauritania 2 DB16-20 methodology compare
- 134 Niger 2 DB16-20 methodology compare
- 134 Poland 2 DB16-20 methodology compare
- 134 Sao Tome and Principe 2 DB16-20 methodology compare
- 134 Senegal 2 DB16-20 methodology compare
- 134 Solomon Islands 2 DB16-20 methodology compare
- 134 South Sudan 2 DB16-20 methodology compare
- 134 Saint Vincent and the Grenadines 2 DB16-20 methodology compare
- 134 Sudan 2 DB16-20 methodology compare
- 134 Suriname 2 DB16-20 methodology compare
- 134 Timor-Leste 2 DB16-20 methodology compare
- 134 Togo 2 DB16-20 methodology compare
- 134 Zambia 2 DB16-20 methodology compare
More private sector data for Antigua and Barbuda
- Merchandise trade 41.5% (2025)
- Food imports 27.7% (2024)
- Manufactures imports 68.5% (2024)
- Merchandise imports 938.00 million current US$ (2025)
- Food exports 84.7% (2024)
- Manufactures exports 14.8% (2024)
- Merchandise exports 32.00 million current US$ (2025)
- Merchandise exports (current US$), per capita 339.67 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.0137 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate -3.03 % change on previous year (2025)
Frequently asked questions
- What is dealing with construction permits: quality control after construction in Antigua and Barbuda?
- Dealing with construction permits: quality control after construction in Antigua and Barbuda was 2 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control after construction recorded in Antigua and Barbuda?
- The highest recorded value was 2 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control after construction recorded in Antigua and Barbuda?
- The lowest recorded value was 2 DB16-20 methodology in 2014.
- How does Antigua and Barbuda rank for dealing with construction permits: quality control after construction?
- Antigua and Barbuda ranks 134th out of 185 countries with data for 2019.
- Is dealing with construction permits: quality control after construction rising or falling in Antigua and Barbuda?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Antigua and Barbuda data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.