Dealing with construction permits: Time in Guinea-Bissau

Guinea-Bissau: Dealing with construction permits: Time was 143 days in 2019. ▲ Rising

Latest (2019)
143 days
Change on year
unchanged
World rank
87th
of 185 countries
All-time high
143 days
in 2013
All-time low
128 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Guinea-Bissau, 2005–2019

0501001502005201220192005: 128 days2006: 128 days2007: 128 days2008: 128 days2009: 128 days2010: 128 days2011: 128 days2012: 128 days2013: 143 days2014: 143 days2015: 143 days2016: 143 days2017: 143 days2018: 143 days2019: 143 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Guinea-Bissau stood at 143 days. That is the highest value across all 15 years on record.

That represents a change of up 11.7% over ten years.

Over the whole period, dealing with construction permits: time in Guinea-Bissau peaked at 143 days in 2013 and was at its lowest, 128 days, in 2005.

That places Guinea-Bissau 87th out of 185 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently rising across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 128 days 128 days 128 days 5
2010s 138.5 days 128 days 143 days 10

Countries ranked near Guinea-Bissau

  1. 84 San Marino 145.5 days compare
  2. 85 Antigua and Barbuda 144 days compare
  3. 85 Equatorial Guinea 144 days compare
  4. 88 Belize 142 days compare
  5. 89 Fiji 141 days compare
  6. 90 Jamaica 140.5 days compare

See the full ranking of 187 places →

More private sector data for Guinea-Bissau

All data for Guinea-Bissau →

Frequently asked questions

What is dealing with construction permits: time in Guinea-Bissau?
Dealing with construction permits: time in Guinea-Bissau was 143 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Guinea-Bissau?
The highest recorded value was 143 days in 2013.
What is the lowest dealing with construction permits: time recorded in Guinea-Bissau?
The lowest recorded value was 128 days in 2005.
How does Guinea-Bissau rank for dealing with construction permits: time?
Guinea-Bissau ranks 87th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Guinea-Bissau?
Over the last ten years it is up 11.7%. The long-run trend across the full record is rising.
Where does this Guinea-Bissau data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.