Getting electricity: Minimum outage time (in minutes) in Egypt
Egypt: Getting electricity: Minimum outage time (in minutes) was 5 DB16-20 methodology in 2019. ▬ Flat
Getting electricity: Minimum outage time (in minutes) in Egypt, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, getting electricity: minimum outage time (in minutes) in Egypt stood at 5 DB16-20 methodology. That is the highest value across all 6 years on record.
The figure is unchanged over ten years.
Egypt ranks 5th of 137 countries on this measure, in the top 10%.
Getting electricity: Minimum outage time (in minutes) in Egypt, year by year
| Year | DB16-20 methodology | Change |
|---|---|---|
| 2014 | 5 DB16-20 methodology | — |
| 2015 | 5 DB16-20 methodology | +0.0% |
| 2016 | 5 DB16-20 methodology | +0.0% |
| 2017 | 5 DB16-20 methodology | +0.0% |
| 2018 | 5 DB16-20 methodology | +0.0% |
| 2019 | 5 DB16-20 methodology | +0.0% |
Egypt compared with similar countries
- Egypt's 5 DB16-20 methodology is above the median for lower middle income countries, which is 4.5 DB16-20 methodology, 1.1× the median. (24 countries reporting)
- Egypt's 5 DB16-20 methodology is above the median for Middle East, North Africa, Afghanistan & Pakistan, which is 3 DB16-20 methodology, 1.7× the median. (16 countries reporting)
Countries ranked near Egypt
- 4 Zimbabwe 10 DB16-20 methodology compare
- 5 India 5 DB16-20 methodology compare
- 5 Indonesia 5 DB16-20 methodology compare
- 5 Nigeria 5 DB16-20 methodology compare
- 5 Mexico 5 DB16-20 methodology compare
- 5 Armenia 5 DB16-20 methodology compare
- 5 Barbados 5 DB16-20 methodology compare
- 5 Belize 5 DB16-20 methodology compare
- 5 Bhutan 5 DB16-20 methodology compare
- 5 Costa Rica 5 DB16-20 methodology compare
- 5 Cote d'Ivoire 5 DB16-20 methodology compare
- 5 Cyprus 5 DB16-20 methodology compare
- 5 Dominica 5 DB16-20 methodology compare
- 5 Eswatini 5 DB16-20 methodology compare
- 5 Fiji 5 DB16-20 methodology compare
- 5 Grenada 5 DB16-20 methodology compare
- 5 Guyana 5 DB16-20 methodology compare
- 5 Iran 5 DB16-20 methodology compare
- 5 Jamaica 5 DB16-20 methodology compare
- 5 South Korea 5 DB16-20 methodology compare
- 5 Kuwait 5 DB16-20 methodology compare
- 5 Mauritania 5 DB16-20 methodology compare
- 5 Mongolia 5 DB16-20 methodology compare
- 5 Namibia 5 DB16-20 methodology compare
- 5 Oman 5 DB16-20 methodology compare
- 5 Papua New Guinea 5 DB16-20 methodology compare
- 5 Philippines 5 DB16-20 methodology compare
- 5 Puerto Rico 5 DB16-20 methodology compare
- 5 Qatar 5 DB16-20 methodology compare
- 5 Rwanda 5 DB16-20 methodology compare
- 5 Samoa 5 DB16-20 methodology compare
- 5 Saudi Arabia 5 DB16-20 methodology compare
- 5 South Africa 5 DB16-20 methodology compare
- 5 Sudan 5 DB16-20 methodology compare
- 5 Togo 5 DB16-20 methodology compare
- 5 Tonga 5 DB16-20 methodology compare
- 5 Turkey 5 DB16-20 methodology compare
- 5 Uganda 5 DB16-20 methodology compare
- 5 United Arab Emirates 5 DB16-20 methodology compare
- 5 Vietnam 5 DB16-20 methodology compare
- 5 Zambia 5 DB16-20 methodology compare
More private sector data for Egypt
- Merchandise trade 40.8% (2025)
- Food imports 19.1% (2025)
- Manufactures imports 50.4% (2025)
- Merchandise imports 97.54 billion current US$ (2025)
- Commercial service imports 26.94 billion current US$ (2025)
- Food exports 21.6% (2025)
- Manufactures exports 47.8% (2025)
- Merchandise exports 51.40 billion current US$ (2025)
- Commercial service exports 33.52 billion current US$ (2025)
- Merchandise exports (current US$), per capita 434.27 current US$ per person (2025)
Frequently asked questions
- What is getting electricity: minimum outage time (in minutes) in Egypt?
- Getting electricity: minimum outage time (in minutes) in Egypt was 5 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest getting electricity: minimum outage time (in minutes) recorded in Egypt?
- The highest recorded value was 5 DB16-20 methodology in 2014.
- What is the lowest getting electricity: minimum outage time (in minutes) recorded in Egypt?
- The lowest recorded value was 5 DB16-20 methodology in 2014.
- How does Egypt rank for getting electricity: minimum outage time (in minutes)?
- Egypt ranks 5th out of 137 countries with data for 2019.
- Is getting electricity: minimum outage time (in minutes) rising or falling in Egypt?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Egypt data come from?
- The figures come from the World Bank, published as part of Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.