Getting electricity: Minimum outage time (in minutes) in Samoa
Samoa: Getting electricity: Minimum outage time (in minutes) was 5 DB16-20 methodology in 2019. ▬ Flat
Getting electricity: Minimum outage time (in minutes) in Samoa, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
The most recent figure for getting electricity: minimum outage time (in minutes) in Samoa is 5 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.
That represents a change of unchanged over ten years.
Samoa ranks 5th of 135 countries on this measure, in the top 10%.
Countries ranked near Samoa
- 4 Zimbabwe 10 DB16-20 methodology compare
- 5 India 5 DB16-20 methodology compare
- 5 Indonesia 5 DB16-20 methodology compare
- 5 Nigeria 5 DB16-20 methodology compare
- 5 Mexico 5 DB16-20 methodology compare
- 5 Armenia 5 DB16-20 methodology compare
- 5 Barbados 5 DB16-20 methodology compare
- 5 Belize 5 DB16-20 methodology compare
- 5 Bhutan 5 DB16-20 methodology compare
- 5 Costa Rica 5 DB16-20 methodology compare
- 5 Cote d'Ivoire 5 DB16-20 methodology compare
- 5 Cyprus 5 DB16-20 methodology compare
- 5 Dominica 5 DB16-20 methodology compare
- 5 Egypt 5 DB16-20 methodology compare
- 5 Eswatini 5 DB16-20 methodology compare
- 5 Fiji 5 DB16-20 methodology compare
- 5 Grenada 5 DB16-20 methodology compare
- 5 Guyana 5 DB16-20 methodology compare
- 5 Iran 5 DB16-20 methodology compare
- 5 Jamaica 5 DB16-20 methodology compare
- 5 South Korea 5 DB16-20 methodology compare
- 5 Kuwait 5 DB16-20 methodology compare
- 5 Mauritania 5 DB16-20 methodology compare
- 5 Mongolia 5 DB16-20 methodology compare
- 5 Namibia 5 DB16-20 methodology compare
- 5 Oman 5 DB16-20 methodology compare
- 5 Papua New Guinea 5 DB16-20 methodology compare
- 5 Philippines 5 DB16-20 methodology compare
- 5 Puerto Rico 5 DB16-20 methodology compare
- 5 Qatar 5 DB16-20 methodology compare
- 5 Rwanda 5 DB16-20 methodology compare
- 5 Saudi Arabia 5 DB16-20 methodology compare
- 5 South Africa 5 DB16-20 methodology compare
- 5 Sudan 5 DB16-20 methodology compare
- 5 Togo 5 DB16-20 methodology compare
- 5 Tonga 5 DB16-20 methodology compare
- 5 Turkey 5 DB16-20 methodology compare
- 5 Uganda 5 DB16-20 methodology compare
- 5 United Arab Emirates 5 DB16-20 methodology compare
- 5 Vietnam 5 DB16-20 methodology compare
- 5 Zambia 5 DB16-20 methodology compare
More private sector data for Samoa
- Merchandise trade 38.1% (2025)
- Food imports 29.6% (2024)
- Manufactures imports 48.0% (2024)
- Merchandise imports 467.00 million current US$ (2025)
- Food exports 24.8% (2024)
- Manufactures exports 39.4% (2024)
- Merchandise exports 24.00 million current US$ (2025)
- Commercial service exports 328.00 million current US$ (2025)
- Transport services 44.9% (2025)
- Computer, communications and other services 31.6% (2025)
Frequently asked questions
- What is getting electricity: minimum outage time (in minutes) in Samoa?
- Getting electricity: minimum outage time (in minutes) in Samoa was 5 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest getting electricity: minimum outage time (in minutes) recorded in Samoa?
- The highest recorded value was 5 DB16-20 methodology in 2014.
- What is the lowest getting electricity: minimum outage time (in minutes) recorded in Samoa?
- The lowest recorded value was 5 DB16-20 methodology in 2014.
- How does Samoa rank for getting electricity: minimum outage time (in minutes)?
- Samoa ranks 5th out of 135 countries with data for 2019.
- Is getting electricity: minimum outage time (in minutes) rising or falling in Samoa?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Samoa data come from?
- The figures come from the World Bank, published as part of Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.