Getting electricity: Minimum outage time (in minutes) in Rwanda
Rwanda: Getting electricity: Minimum outage time (in minutes) was 5 DB16-20 methodology in 2019. ▼ Falling
Getting electricity: Minimum outage time (in minutes) in Rwanda, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
The most recent figure for getting electricity: minimum outage time (in minutes) in Rwanda is 5 DB16-20 methodology, measured in 2019. That is the lowest value across all 6 years on record.
Compared with earlier readings it is down 50.0% over ten years.
Rwanda ranks 5th of 135 countries on this measure, in the top 10%.
Countries ranked near Rwanda
- 4 Zimbabwe 10 DB16-20 methodology compare
- 5 India 5 DB16-20 methodology compare
- 5 Indonesia 5 DB16-20 methodology compare
- 5 Nigeria 5 DB16-20 methodology compare
- 5 Mexico 5 DB16-20 methodology compare
- 5 Armenia 5 DB16-20 methodology compare
- 5 Barbados 5 DB16-20 methodology compare
- 5 Belize 5 DB16-20 methodology compare
- 5 Bhutan 5 DB16-20 methodology compare
- 5 Costa Rica 5 DB16-20 methodology compare
- 5 Cote d'Ivoire 5 DB16-20 methodology compare
- 5 Cyprus 5 DB16-20 methodology compare
- 5 Dominica 5 DB16-20 methodology compare
- 5 Egypt 5 DB16-20 methodology compare
- 5 Eswatini 5 DB16-20 methodology compare
- 5 Fiji 5 DB16-20 methodology compare
- 5 Grenada 5 DB16-20 methodology compare
- 5 Guyana 5 DB16-20 methodology compare
- 5 Iran 5 DB16-20 methodology compare
- 5 Jamaica 5 DB16-20 methodology compare
- 5 South Korea 5 DB16-20 methodology compare
- 5 Kuwait 5 DB16-20 methodology compare
- 5 Mauritania 5 DB16-20 methodology compare
- 5 Mongolia 5 DB16-20 methodology compare
- 5 Namibia 5 DB16-20 methodology compare
- 5 Oman 5 DB16-20 methodology compare
- 5 Papua New Guinea 5 DB16-20 methodology compare
- 5 Philippines 5 DB16-20 methodology compare
- 5 Puerto Rico 5 DB16-20 methodology compare
- 5 Qatar 5 DB16-20 methodology compare
- 5 Samoa 5 DB16-20 methodology compare
- 5 Saudi Arabia 5 DB16-20 methodology compare
- 5 South Africa 5 DB16-20 methodology compare
- 5 Sudan 5 DB16-20 methodology compare
- 5 Togo 5 DB16-20 methodology compare
- 5 Tonga 5 DB16-20 methodology compare
- 5 Turkey 5 DB16-20 methodology compare
- 5 Uganda 5 DB16-20 methodology compare
- 5 United Arab Emirates 5 DB16-20 methodology compare
- 5 Vietnam 5 DB16-20 methodology compare
- 5 Zambia 5 DB16-20 methodology compare
More private sector data for Rwanda
- Merchandise trade 45.9% (2025)
- Food imports 22.4% (2022)
- Manufactures imports 50.0% (2022)
- Merchandise imports 5.07 billion current US$ (2025)
- Food exports 27.2% (2022)
- Manufactures exports 10.4% (2022)
- Merchandise exports 2.45 billion current US$ (2025)
- Commercial service exports 857.32 million current US$ (2024)
- Transport services 48.1% (2024)
- Computer, communications and other services 10.2% (2024)
Frequently asked questions
- What is getting electricity: minimum outage time (in minutes) in Rwanda?
- Getting electricity: minimum outage time (in minutes) in Rwanda was 5 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest getting electricity: minimum outage time (in minutes) recorded in Rwanda?
- The highest recorded value was 10 DB16-20 methodology in 2014.
- What is the lowest getting electricity: minimum outage time (in minutes) recorded in Rwanda?
- The lowest recorded value was 5 DB16-20 methodology in 2018.
- How does Rwanda rank for getting electricity: minimum outage time (in minutes)?
- Rwanda ranks 5th out of 135 countries with data for 2019.
- Is getting electricity: minimum outage time (in minutes) rising or falling in Rwanda?
- Over the last ten years it is down 50.0%. The long-run trend across the full record is falling.
- Where does this Rwanda data come from?
- The figures come from the World Bank, published as part of Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.