Getting electricity: Minimum outage time (in minutes) in Togo
Togo: Getting electricity: Minimum outage time (in minutes) was 5 DB16-20 methodology in 2019. ▬ Flat
Getting electricity: Minimum outage time (in minutes) in Togo, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
The most recent figure for getting electricity: minimum outage time (in minutes) in Togo is 5 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.
The figure is unchanged over ten years.
Togo ranks 5th of 135 countries on this measure, in the top 10%.
Countries ranked near Togo
- 4 Zimbabwe 10 DB16-20 methodology compare
- 5 India 5 DB16-20 methodology compare
- 5 Indonesia 5 DB16-20 methodology compare
- 5 Nigeria 5 DB16-20 methodology compare
- 5 Mexico 5 DB16-20 methodology compare
- 5 Armenia 5 DB16-20 methodology compare
- 5 Barbados 5 DB16-20 methodology compare
- 5 Belize 5 DB16-20 methodology compare
- 5 Bhutan 5 DB16-20 methodology compare
- 5 Costa Rica 5 DB16-20 methodology compare
- 5 Cote d'Ivoire 5 DB16-20 methodology compare
- 5 Cyprus 5 DB16-20 methodology compare
- 5 Dominica 5 DB16-20 methodology compare
- 5 Egypt 5 DB16-20 methodology compare
- 5 Eswatini 5 DB16-20 methodology compare
- 5 Fiji 5 DB16-20 methodology compare
- 5 Grenada 5 DB16-20 methodology compare
- 5 Guyana 5 DB16-20 methodology compare
- 5 Iran 5 DB16-20 methodology compare
- 5 Jamaica 5 DB16-20 methodology compare
- 5 South Korea 5 DB16-20 methodology compare
- 5 Kuwait 5 DB16-20 methodology compare
- 5 Mauritania 5 DB16-20 methodology compare
- 5 Mongolia 5 DB16-20 methodology compare
- 5 Namibia 5 DB16-20 methodology compare
- 5 Oman 5 DB16-20 methodology compare
- 5 Papua New Guinea 5 DB16-20 methodology compare
- 5 Philippines 5 DB16-20 methodology compare
- 5 Puerto Rico 5 DB16-20 methodology compare
- 5 Qatar 5 DB16-20 methodology compare
- 5 Rwanda 5 DB16-20 methodology compare
- 5 Samoa 5 DB16-20 methodology compare
- 5 Saudi Arabia 5 DB16-20 methodology compare
- 5 Sudan 5 DB16-20 methodology compare
- 5 Tonga 5 DB16-20 methodology compare
- 5 Turkey 5 DB16-20 methodology compare
- 5 Uganda 5 DB16-20 methodology compare
- 5 United Arab Emirates 5 DB16-20 methodology compare
- 5 Vietnam 5 DB16-20 methodology compare
- 5 Zambia 5 DB16-20 methodology compare
More private sector data for Togo
- Merchandise trade 43.7% (2025)
- Food imports 17.6% (2024)
- Manufactures imports 64.9% (2024)
- Merchandise imports 3.40 billion current US$ (2025)
- Food exports 33.0% (2024)
- Manufactures exports 39.3% (2024)
- Merchandise exports 1.80 billion current US$ (2025)
- Commercial service exports 479.01 million current US$ (2020)
- Transport services 67.8% (2020)
- Computer, communications and other services 14.8% (2020)
Frequently asked questions
- What is getting electricity: minimum outage time (in minutes) in Togo?
- Getting electricity: minimum outage time (in minutes) in Togo was 5 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest getting electricity: minimum outage time (in minutes) recorded in Togo?
- The highest recorded value was 5 DB16-20 methodology in 2014.
- What is the lowest getting electricity: minimum outage time (in minutes) recorded in Togo?
- The lowest recorded value was 5 DB16-20 methodology in 2014.
- How does Togo rank for getting electricity: minimum outage time (in minutes)?
- Togo ranks 5th out of 135 countries with data for 2019.
- Is getting electricity: minimum outage time (in minutes) rising or falling in Togo?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Togo data come from?
- The figures come from the World Bank, published as part of Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.