Dealing with construction permits: Time in Benin

Benin: Dealing with construction permits: Time was 88 days in 2019. ▼ Falling

Latest (2019)
88 days
Change on year
unchanged
World rank
155th
of 185 countries
All-time high
317 days
in 2008
All-time low
88 days
in 2015
Years of data
15
2005–2019

Dealing with construction permits: Time in Benin, 2005–2019

1001502002503002005201220192005: 238 days2006: 238 days2007: 238 days2008: 317 days2009: 317 days2010: 227 days2011: 227 days2012: 137 days2013: 120 days2014: 111 days2015: 88 days2016: 88 days2017: 88 days2018: 88 days2019: 88 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Benin stood at 88 days. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 72.2% over ten years.

Over the whole period, dealing with construction permits: time in Benin peaked at 317 days in 2008 and was at its lowest, 88 days, in 2015.

That places Benin 155th out of 185 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 269.6 days 238 days 317 days 5
2010s 126.2 days 88 days 227 days 10

Countries ranked near Benin

  1. 153 North Macedonia 91 days compare
  2. 154 Palau 90 days compare
  3. 155 Myanmar 88 days compare
  4. 157 Qatar 87.5 days compare
  5. 158 Liberia 87 days compare
  6. 158 Syrian Arab Republic 87 days compare

See the full ranking of 187 places →

More private sector data for Benin

All data for Benin →

Frequently asked questions

What is dealing with construction permits: time in Benin?
Dealing with construction permits: time in Benin was 88 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Benin?
The highest recorded value was 317 days in 2008.
What is the lowest dealing with construction permits: time recorded in Benin?
The lowest recorded value was 88 days in 2015.
How does Benin rank for dealing with construction permits: time?
Benin ranks 155th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Benin?
Over the last ten years it is down 72.2%. The long-run trend across the full record is falling.
Where does this Benin data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.