Dealing with construction permits: Quality control during in Djibouti
Djibouti: Dealing with construction permits: Quality control during was 3 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control during in Djibouti, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
The most recent figure for dealing with construction permits: quality control during in Djibouti is 3 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.
The figure is unchanged over ten years.
Djibouti ranks 1st of 185 countries on this measure, in the top 10%.
Countries ranked near Djibouti
- 1 China (People’s Republic of) 3 DB16-20 methodology compare
- 1 Russia 3 DB16-20 methodology compare
- 1 Australia 3 DB16-20 methodology compare
- 1 Denmark 3 DB16-20 methodology compare
- 1 Estonia 3 DB16-20 methodology compare
- 1 France 3 DB16-20 methodology compare
- 1 Hong Kong Special Administrative Region, People's Republic of China 3 DB16-20 methodology compare
- 1 Ireland 3 DB16-20 methodology compare
- 1 Luxembourg 3 DB16-20 methodology compare
- 1 Netherlands 3 DB16-20 methodology compare
- 1 New Zealand 3 DB16-20 methodology compare
- 1 Peru 3 DB16-20 methodology compare
- 1 Rwanda 3 DB16-20 methodology compare
- 1 Singapore 3 DB16-20 methodology compare
- 1 Sweden 3 DB16-20 methodology compare
- 1 United Arab Emirates 3 DB16-20 methodology compare
- 1 United Kingdom 3 DB16-20 methodology compare
More private sector data for Djibouti
- Merchandise trade 267.1% (2025)
- Food imports 38.6% (2023)
- Manufactures imports 51.9% (2023)
- Merchandise imports 6.26 billion current US$ (2025)
- Food exports 41.5% (2023)
- Manufactures exports 56.6% (2023)
- Merchandise exports 6.09 billion current US$ (2025)
- Merchandise exports (current US$), per capita 5,143 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 1.32 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate 17.82 % change on previous year (2025)
Frequently asked questions
- What is dealing with construction permits: quality control during in Djibouti?
- Dealing with construction permits: quality control during in Djibouti was 3 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control during recorded in Djibouti?
- The highest recorded value was 3 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control during recorded in Djibouti?
- The lowest recorded value was 3 DB16-20 methodology in 2014.
- How does Djibouti rank for dealing with construction permits: quality control during?
- Djibouti ranks 1st out of 185 countries with data for 2019.
- Is dealing with construction permits: quality control during rising or falling in Djibouti?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Djibouti data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.