Dealing with construction: Quality control during in France
France: Dealing with construction: Quality control during was 3 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control during in France, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, dealing with construction permits: quality control during in France stood at 3 DB16-20 methodology. That is the highest value across all 6 years on record.
The figure is unchanged over ten years.
France ranks 1st of 186 countries on this measure, in the top 10%.
Dealing with construction: Quality control during in France, year by year
| Year | DB16-20 methodology | Change |
|---|---|---|
| 2014 | 3 DB16-20 methodology | — |
| 2015 | 3 DB16-20 methodology | +0.0% |
| 2016 | 3 DB16-20 methodology | +0.0% |
| 2017 | 3 DB16-20 methodology | +0.0% |
| 2018 | 3 DB16-20 methodology | +0.0% |
| 2019 | 3 DB16-20 methodology | +0.0% |
France compared with similar countries
- France's 3 DB16-20 methodology is above the median for high income countries, which is 2 DB16-20 methodology, 1.5× the median. (62 countries reporting)
- France's 3 DB16-20 methodology is above the median for Europe & Central Asia, which is 2 DB16-20 methodology, 1.5× the median. (49 countries reporting)
Countries ranked near France
- 1 China 3 DB16-20 methodology compare
- 1 Russia 3 DB16-20 methodology compare
- 1 Australia 3 DB16-20 methodology compare
- 1 Denmark 3 DB16-20 methodology compare
- 1 Djibouti 3 DB16-20 methodology compare
- 1 Estonia 3 DB16-20 methodology compare
- 1 Hong Kong 3 DB16-20 methodology compare
- 1 Ireland 3 DB16-20 methodology compare
- 1 Luxembourg 3 DB16-20 methodology compare
- 1 Netherlands 3 DB16-20 methodology compare
- 1 New Zealand 3 DB16-20 methodology compare
- 1 Peru 3 DB16-20 methodology compare
- 1 Rwanda 3 DB16-20 methodology compare
- 1 Singapore 3 DB16-20 methodology compare
- 1 Sweden 3 DB16-20 methodology compare
- 1 United Arab Emirates 3 DB16-20 methodology compare
- 1 United Kingdom 3 DB16-20 methodology compare
More private sector data for France
- Merchandise trade 43.7% (2025)
- Food imports 11.5% (2025)
- Manufactures imports 74.0% (2025)
- Merchandise imports 786.43 billion current US$ (2025)
- Commercial service imports 378.61 billion current US$ (2025)
- Food exports 13.4% (2025)
- Manufactures exports 78.5% (2025)
- Merchandise exports 683.10 billion current US$ (2025)
- Commercial service exports 428.61 billion current US$ (2025)
- Merchandise exports (current US$), per capita 9,940 current US$ per person (2025)
Frequently asked questions
- What is dealing with construction permits: quality control during in France?
- Dealing with construction permits: quality control during in France was 3 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control during recorded in France?
- The highest recorded value was 3 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control during recorded in France?
- The lowest recorded value was 3 DB16-20 methodology in 2014.
- How does France rank for dealing with construction permits: quality control during?
- France ranks 1st out of 186 countries with data for 2019.
- Is dealing with construction permits: quality control during rising or falling in France?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this France data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.