Dealing with construction permits: Quality control during in Dominica

Dominica: Dealing with construction permits: Quality control during was 1 DB16-20 methodology in 2019. β–¬ Flat

Latest (2019)
1 DB16-20 methodology
Change on year
unchanged
World rank
138th
of 185 countries
All-time high
1 DB16-20 methodology
in 2014
All-time low
1 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Quality control during in Dominica, 2014–2019

00.20.40.60.812014201620192014: 1 DB16-20 methodology2015: 1 DB16-20 methodology2016: 1 DB16-20 methodology2017: 1 DB16-20 methodology2018: 1 DB16-20 methodology2019: 1 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

In 2019, dealing with construction permits: quality control during in Dominica stood at 1 DB16-20 methodology. That is the highest value across all 6 years on record.

Compared with earlier readings it is unchanged over ten years.

Dominica ranks 138th of 185 countries on this measure, in the middle of the range.

Countries ranked near Dominica

  1. 138 Antigua and Barbuda 1 DB16-20 methodology compare
  2. 138 Burundi 1 DB16-20 methodology compare
  3. 138 Central African Republic 1 DB16-20 methodology compare
  4. 138 El Salvador 1 DB16-20 methodology compare
  5. 138 Grenada 1 DB16-20 methodology compare
  6. 138 Guyana 1 DB16-20 methodology compare
  7. 138 Haiti 1 DB16-20 methodology compare
  8. 138 Honduras 1 DB16-20 methodology compare
  9. 138 Kenya 1 DB16-20 methodology compare
  10. 138 Kiribati 1 DB16-20 methodology compare
  11. 138 Malawi 1 DB16-20 methodology compare
  12. 138 Seychelles 1 DB16-20 methodology compare
  13. 138 Solomon Islands 1 DB16-20 methodology compare
  14. 138 South Sudan 1 DB16-20 methodology compare
  15. 138 Sri Lanka 1 DB16-20 methodology compare
  16. 138 Timor-Leste 1 DB16-20 methodology compare
  17. 138 Togo 1 DB16-20 methodology compare
  18. 138 Trinidad and Tobago 1 DB16-20 methodology compare
  19. 138 Vanuatu 1 DB16-20 methodology compare
  20. 138 Zambia 1 DB16-20 methodology compare

See the full ranking of 185 places β†’

More private sector data for Dominica

All data for Dominica β†’

Frequently asked questions

What is dealing with construction permits: quality control during in Dominica?
Dealing with construction permits: quality control during in Dominica was 1 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: quality control during recorded in Dominica?
The highest recorded value was 1 DB16-20 methodology in 2014.
What is the lowest dealing with construction permits: quality control during recorded in Dominica?
The lowest recorded value was 1 DB16-20 methodology in 2014.
How does Dominica rank for dealing with construction permits: quality control during?
Dominica ranks 138th out of 185 countries with data for 2019.
Is dealing with construction permits: quality control during rising or falling in Dominica?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Dominica data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV Β· JSON β€” 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Quality control during in Dominica. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/dominica/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/dominica/">Dealing with construction permits: Quality control during in Dominica</a> β€” Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.