Dealing with construction permits: Quality control during in Dominica
Dominica: Dealing with construction permits: Quality control during was 1 DB16-20 methodology in 2019. β¬ Flat
Dealing with construction permits: Quality control during in Dominica, 2014β2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, dealing with construction permits: quality control during in Dominica stood at 1 DB16-20 methodology. That is the highest value across all 6 years on record.
Compared with earlier readings it is unchanged over ten years.
Dominica ranks 138th of 185 countries on this measure, in the middle of the range.
Countries ranked near Dominica
- 138 Antigua and Barbuda 1 DB16-20 methodology compare
- 138 Burundi 1 DB16-20 methodology compare
- 138 Central African Republic 1 DB16-20 methodology compare
- 138 El Salvador 1 DB16-20 methodology compare
- 138 Grenada 1 DB16-20 methodology compare
- 138 Guyana 1 DB16-20 methodology compare
- 138 Haiti 1 DB16-20 methodology compare
- 138 Honduras 1 DB16-20 methodology compare
- 138 Kenya 1 DB16-20 methodology compare
- 138 Kiribati 1 DB16-20 methodology compare
- 138 Malawi 1 DB16-20 methodology compare
- 138 Seychelles 1 DB16-20 methodology compare
- 138 Solomon Islands 1 DB16-20 methodology compare
- 138 South Sudan 1 DB16-20 methodology compare
- 138 Sri Lanka 1 DB16-20 methodology compare
- 138 Timor-Leste 1 DB16-20 methodology compare
- 138 Togo 1 DB16-20 methodology compare
- 138 Trinidad and Tobago 1 DB16-20 methodology compare
- 138 Vanuatu 1 DB16-20 methodology compare
- 138 Zambia 1 DB16-20 methodology compare
More private sector data for Dominica
- Merchandise trade 39.1% (2025)
- Food imports 25.2% (2023)
- Manufactures imports 53.5% (2023)
- Merchandise imports 259.00 million current US$ (2025)
- Food exports 41.2% (2023)
- Manufactures exports 57.8% (2023)
- Merchandise exports 24.00 million current US$ (2025)
- Commercial service exports 177.62 million current US$ (2025)
- Transport services 19.2% (2025)
- Computer, communications and other services 57.4% (2025)
Frequently asked questions
- What is dealing with construction permits: quality control during in Dominica?
- Dealing with construction permits: quality control during in Dominica was 1 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control during recorded in Dominica?
- The highest recorded value was 1 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control during recorded in Dominica?
- The lowest recorded value was 1 DB16-20 methodology in 2014.
- How does Dominica rank for dealing with construction permits: quality control during?
- Dominica ranks 138th out of 185 countries with data for 2019.
- Is dealing with construction permits: quality control during rising or falling in Dominica?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Dominica data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV Β· JSON β 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.