Dealing with construction: Quality control during in Central African Republic
Central African Republic: Dealing with construction: Quality control during was 1 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control during in Central African Republic, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, dealing with construction permits: quality control during in Central African Republic stood at 1 DB16-20 methodology. That is the highest value across all 6 years on record.
Compared with earlier readings it is unchanged over ten years.
Central African Republic ranks 139th of 186 countries on this measure, in the middle of the range.
Dealing with construction: Quality control during in Central African Republic, year by year
| Year | DB16-20 methodology | Change |
|---|---|---|
| 2014 | 1 DB16-20 methodology | — |
| 2015 | 1 DB16-20 methodology | +0.0% |
| 2016 | 1 DB16-20 methodology | +0.0% |
| 2017 | 1 DB16-20 methodology | +0.0% |
| 2018 | 1 DB16-20 methodology | +0.0% |
| 2019 | 1 DB16-20 methodology | +0.0% |
Central African Republic compared with similar countries
- Central African Republic's 1 DB16-20 methodology is above the median for low income countries, which is 1 DB16-20 methodology, 1.0× the median. (20 countries reporting)
- Central African Republic's 1 DB16-20 methodology is below the median for Sub-Saharan Africa, which is 2 DB16-20 methodology, 50% of the median. (46 countries reporting)
Countries ranked near Central African Republic
- 139 Antigua and Barbuda 1 DB16-20 methodology compare
- 139 Burundi 1 DB16-20 methodology compare
- 139 Dominica 1 DB16-20 methodology compare
- 139 El Salvador 1 DB16-20 methodology compare
- 139 Grenada 1 DB16-20 methodology compare
- 139 Guyana 1 DB16-20 methodology compare
- 139 Haiti 1 DB16-20 methodology compare
- 139 Honduras 1 DB16-20 methodology compare
- 139 Kenya 1 DB16-20 methodology compare
- 139 Kiribati 1 DB16-20 methodology compare
- 139 Malawi 1 DB16-20 methodology compare
- 139 Seychelles 1 DB16-20 methodology compare
- 139 Solomon Islands 1 DB16-20 methodology compare
- 139 South Sudan 1 DB16-20 methodology compare
- 139 Sri Lanka 1 DB16-20 methodology compare
- 139 East Timor 1 DB16-20 methodology compare
- 139 Togo 1 DB16-20 methodology compare
- 139 Trinidad and Tobago 1 DB16-20 methodology compare
- 139 Vanuatu 1 DB16-20 methodology compare
- 139 Zambia 1 DB16-20 methodology compare
More private sector data for Central African Republic
- Merchandise trade 27.0% (2025)
- Food imports 20.9% (2024)
- Manufactures imports 51.1% (2024)
- Merchandise imports 573.00 million current US$ (2025)
- Commercial service imports 113.83 million current US$ (1994)
- Food exports 0.2% (2024)
- Manufactures exports 71.8% (2024)
- Merchandise exports 255.00 million current US$ (2025)
- Commercial service exports 0 current US$ (1994)
- Merchandise exports (current US$), per capita 46.25 current US$ per person (2025)
Frequently asked questions
- What is dealing with construction permits: quality control during in Central African Republic?
- Dealing with construction permits: quality control during in Central African Republic was 1 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control during recorded in Central African Republic?
- The highest recorded value was 1 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control during recorded in Central African Republic?
- The lowest recorded value was 1 DB16-20 methodology in 2014.
- How does Central African Republic rank for dealing with construction permits: quality control during?
- Central African Republic ranks 139th out of 186 countries with data for 2019.
- Is dealing with construction permits: quality control during rising or falling in Central African Republic?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Central African Republic data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.