Dealing with construction: Quality control during in Malawi
Malawi: Dealing with construction: Quality control during was 1 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control during in Malawi, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
Malawi recorded 1 DB16-20 methodology for dealing with construction permits: quality control during in 2019. That is the highest value across all 6 years on record.
Compared with earlier readings it is unchanged over ten years.
That places Malawi 139th out of 186 countries with data for 2019, putting it in the middle of the range.
Dealing with construction: Quality control during in Malawi, year by year
| Year | DB16-20 methodology | Change |
|---|---|---|
| 2014 | 1 DB16-20 methodology | — |
| 2015 | 1 DB16-20 methodology | +0.0% |
| 2016 | 1 DB16-20 methodology | +0.0% |
| 2017 | 1 DB16-20 methodology | +0.0% |
| 2018 | 1 DB16-20 methodology | +0.0% |
| 2019 | 1 DB16-20 methodology | +0.0% |
Malawi compared with similar countries
- Malawi's 1 DB16-20 methodology is above the median for low income countries, which is 1 DB16-20 methodology, 1.0× the median. (20 countries reporting)
- Malawi's 1 DB16-20 methodology is below the median for Sub-Saharan Africa, which is 2 DB16-20 methodology, 50% of the median. (46 countries reporting)
Countries ranked near Malawi
- 139 Antigua and Barbuda 1 DB16-20 methodology compare
- 139 Burundi 1 DB16-20 methodology compare
- 139 Central African Republic 1 DB16-20 methodology compare
- 139 Dominica 1 DB16-20 methodology compare
- 139 El Salvador 1 DB16-20 methodology compare
- 139 Grenada 1 DB16-20 methodology compare
- 139 Guyana 1 DB16-20 methodology compare
- 139 Haiti 1 DB16-20 methodology compare
- 139 Honduras 1 DB16-20 methodology compare
- 139 Kenya 1 DB16-20 methodology compare
- 139 Kiribati 1 DB16-20 methodology compare
- 139 Seychelles 1 DB16-20 methodology compare
- 139 Solomon Islands 1 DB16-20 methodology compare
- 139 South Sudan 1 DB16-20 methodology compare
- 139 Sri Lanka 1 DB16-20 methodology compare
- 139 East Timor 1 DB16-20 methodology compare
- 139 Togo 1 DB16-20 methodology compare
- 139 Trinidad and Tobago 1 DB16-20 methodology compare
- 139 Vanuatu 1 DB16-20 methodology compare
- 139 Zambia 1 DB16-20 methodology compare
More private sector data for Malawi
- Merchandise trade 30.9% (2025)
- Food imports 11.2% (2025)
- Manufactures imports 64.9% (2025)
- Merchandise imports 3.66 billion current US$ (2025)
- Commercial service imports 1.01 billion current US$ (2025)
- Food exports 93.3% (2025)
- Manufactures exports 5.1% (2025)
- Merchandise exports 947.00 million current US$ (2025)
- Commercial service exports 483.71 million current US$ (2025)
- Merchandise exports (current US$), per capita 42.63 current US$ per person (2025)
Frequently asked questions
- What is dealing with construction permits: quality control during in Malawi?
- Dealing with construction permits: quality control during in Malawi was 1 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control during recorded in Malawi?
- The highest recorded value was 1 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control during recorded in Malawi?
- The lowest recorded value was 1 DB16-20 methodology in 2014.
- How does Malawi rank for dealing with construction permits: quality control during?
- Malawi ranks 139th out of 186 countries with data for 2019.
- Is dealing with construction permits: quality control during rising or falling in Malawi?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Malawi data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.