Dealing with construction permits: Quality control during construction in Malawi
Malawi: Dealing with construction permits: Quality control during construction was 1 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control during construction in Malawi, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
Malawi recorded 1 DB16-20 methodology for dealing with construction permits: quality control during construction in 2019. That is the highest value across all 6 years on record.
Compared with earlier readings it is unchanged over ten years.
That places Malawi 136th out of 183 countries with data for 2019, putting it in the middle of the range.
Countries ranked near Malawi
- 136 Antigua and Barbuda 1 DB16-20 methodology compare
- 136 Burundi 1 DB16-20 methodology compare
- 136 Central African Republic 1 DB16-20 methodology compare
- 136 Dominica 1 DB16-20 methodology compare
- 136 El Salvador 1 DB16-20 methodology compare
- 136 Grenada 1 DB16-20 methodology compare
- 136 Guyana 1 DB16-20 methodology compare
- 136 Haiti 1 DB16-20 methodology compare
- 136 Honduras 1 DB16-20 methodology compare
- 136 Kenya 1 DB16-20 methodology compare
- 136 Kiribati 1 DB16-20 methodology compare
- 136 Seychelles 1 DB16-20 methodology compare
- 136 Solomon Islands 1 DB16-20 methodology compare
- 136 South Sudan 1 DB16-20 methodology compare
- 136 Sri Lanka 1 DB16-20 methodology compare
- 136 East Timor 1 DB16-20 methodology compare
- 136 Togo 1 DB16-20 methodology compare
- 136 Trinidad and Tobago 1 DB16-20 methodology compare
- 136 Vanuatu 1 DB16-20 methodology compare
- 136 Zambia 1 DB16-20 methodology compare
More private sector data for Malawi
- Merchandise trade 30.9% (2025)
- Food imports 11.8% (2024)
- Manufactures imports 68.1% (2024)
- Merchandise imports 3.66 billion current US$ (2025)
- Food exports 90.2% (2024)
- Manufactures exports 8.0% (2024)
- Merchandise exports 947.00 million current US$ (2025)
- Commercial service exports 409.15 million current US$ (2024)
- Transport services 45.6% (2024)
- Computer, communications and other services 36.1% (2024)
Frequently asked questions
- What is dealing with construction permits: quality control during construction in Malawi?
- Dealing with construction permits: quality control during construction in Malawi was 1 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control during construction recorded in Malawi?
- The highest recorded value was 1 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control during construction recorded in Malawi?
- The lowest recorded value was 1 DB16-20 methodology in 2014.
- How does Malawi rank for dealing with construction permits: quality control during construction?
- Malawi ranks 136th out of 183 countries with data for 2019.
- Is dealing with construction permits: quality control during construction rising or falling in Malawi?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Malawi data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.