Dealing with construction: Quality control during in Guyana
Guyana: Dealing with construction: Quality control during was 1 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control during in Guyana, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
The most recent figure for dealing with construction permits: quality control during in Guyana is 1 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.
The figure is unchanged over ten years.
Guyana ranks 139th of 186 countries on this measure, in the middle of the range.
Dealing with construction: Quality control during in Guyana, year by year
| Year | DB16-20 methodology | Change |
|---|---|---|
| 2014 | 1 DB16-20 methodology | — |
| 2015 | 1 DB16-20 methodology | +0.0% |
| 2016 | 1 DB16-20 methodology | +0.0% |
| 2017 | 1 DB16-20 methodology | +0.0% |
| 2018 | 1 DB16-20 methodology | +0.0% |
| 2019 | 1 DB16-20 methodology | +0.0% |
Guyana compared with similar countries
- Guyana's 1 DB16-20 methodology is below the median for high income countries, which is 2 DB16-20 methodology, 50% of the median. (62 countries reporting)
- Guyana's 1 DB16-20 methodology is above the median for Latin America & Caribbean, which is 1 DB16-20 methodology, 1.0× the median. (33 countries reporting)
Countries ranked near Guyana
- 139 Antigua and Barbuda 1 DB16-20 methodology compare
- 139 Burundi 1 DB16-20 methodology compare
- 139 Central African Republic 1 DB16-20 methodology compare
- 139 Dominica 1 DB16-20 methodology compare
- 139 El Salvador 1 DB16-20 methodology compare
- 139 Grenada 1 DB16-20 methodology compare
- 139 Haiti 1 DB16-20 methodology compare
- 139 Honduras 1 DB16-20 methodology compare
- 139 Kenya 1 DB16-20 methodology compare
- 139 Kiribati 1 DB16-20 methodology compare
- 139 Malawi 1 DB16-20 methodology compare
- 139 Seychelles 1 DB16-20 methodology compare
- 139 Solomon Islands 1 DB16-20 methodology compare
- 139 South Sudan 1 DB16-20 methodology compare
- 139 Sri Lanka 1 DB16-20 methodology compare
- 139 East Timor 1 DB16-20 methodology compare
- 139 Togo 1 DB16-20 methodology compare
- 139 Trinidad and Tobago 1 DB16-20 methodology compare
- 139 Vanuatu 1 DB16-20 methodology compare
- 139 Zambia 1 DB16-20 methodology compare
More private sector data for Guyana
- Merchandise trade 106.7% (2025)
- Food imports 6.3% (2025)
- Manufactures imports 79.8% (2025)
- Merchandise imports 10.22 billion current US$ (2025)
- Commercial service imports 4.92 billion current US$ (2023)
- Food exports 1.7% (2025)
- Manufactures exports 0.2% (2025)
- Merchandise exports 18.69 billion current US$ (2025)
- Commercial service exports 523.75 million current US$ (2023)
- Merchandise exports (current US$), per capita 22,360 current US$ per person (2025)
Frequently asked questions
- What is dealing with construction permits: quality control during in Guyana?
- Dealing with construction permits: quality control during in Guyana was 1 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control during recorded in Guyana?
- The highest recorded value was 1 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control during recorded in Guyana?
- The lowest recorded value was 1 DB16-20 methodology in 2014.
- How does Guyana rank for dealing with construction permits: quality control during?
- Guyana ranks 139th out of 186 countries with data for 2019.
- Is dealing with construction permits: quality control during rising or falling in Guyana?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Guyana data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.