Dealing with construction permits: Quality control during construction in Guyana
Guyana: Dealing with construction permits: Quality control during construction was 1 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control during construction in Guyana, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
The most recent figure for dealing with construction permits: quality control during construction in Guyana is 1 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.
The figure is unchanged over ten years.
Guyana ranks 136th of 183 countries on this measure, in the middle of the range.
Countries ranked near Guyana
- 136 Antigua and Barbuda 1 DB16-20 methodology compare
- 136 Burundi 1 DB16-20 methodology compare
- 136 Central African Republic 1 DB16-20 methodology compare
- 136 Dominica 1 DB16-20 methodology compare
- 136 El Salvador 1 DB16-20 methodology compare
- 136 Grenada 1 DB16-20 methodology compare
- 136 Haiti 1 DB16-20 methodology compare
- 136 Honduras 1 DB16-20 methodology compare
- 136 Kenya 1 DB16-20 methodology compare
- 136 Kiribati 1 DB16-20 methodology compare
- 136 Malawi 1 DB16-20 methodology compare
- 136 Seychelles 1 DB16-20 methodology compare
- 136 Solomon Islands 1 DB16-20 methodology compare
- 136 South Sudan 1 DB16-20 methodology compare
- 136 Sri Lanka 1 DB16-20 methodology compare
- 136 East Timor 1 DB16-20 methodology compare
- 136 Togo 1 DB16-20 methodology compare
- 136 Trinidad and Tobago 1 DB16-20 methodology compare
- 136 Vanuatu 1 DB16-20 methodology compare
- 136 Zambia 1 DB16-20 methodology compare
More private sector data for Guyana
- Merchandise trade 106.7% (2025)
- Food imports 6.5% (2025)
- Manufactures imports 83.1% (2025)
- Merchandise imports 10.22 billion current US$ (2025)
- Food exports 1.5% (2025)
- Manufactures exports 0.5% (2025)
- Merchandise exports 18.69 billion current US$ (2025)
- Commercial service exports 523.75 million current US$ (2023)
- Transport services 12.9% (2023)
- Computer, communications and other services 83.9% (2023)
Frequently asked questions
- What is dealing with construction permits: quality control during construction in Guyana?
- Dealing with construction permits: quality control during construction in Guyana was 1 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control during construction recorded in Guyana?
- The highest recorded value was 1 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control during construction recorded in Guyana?
- The lowest recorded value was 1 DB16-20 methodology in 2014.
- How does Guyana rank for dealing with construction permits: quality control during construction?
- Guyana ranks 136th out of 183 countries with data for 2019.
- Is dealing with construction permits: quality control during construction rising or falling in Guyana?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Guyana data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.