Dealing with construction: Quality control during in Vanuatu
Vanuatu: Dealing with construction: Quality control during was 1 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control during in Vanuatu, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
The most recent figure for dealing with construction permits: quality control during in Vanuatu is 1 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.
Compared with earlier readings it is unchanged over ten years.
Vanuatu ranks 139th of 186 countries on this measure, in the middle of the range.
Dealing with construction: Quality control during in Vanuatu, year by year
| Year | DB16-20 methodology | Change |
|---|---|---|
| 2014 | 1 DB16-20 methodology | — |
| 2015 | 1 DB16-20 methodology | +0.0% |
| 2016 | 1 DB16-20 methodology | +0.0% |
| 2017 | 1 DB16-20 methodology | +0.0% |
| 2018 | 1 DB16-20 methodology | +0.0% |
| 2019 | 1 DB16-20 methodology | +0.0% |
Vanuatu compared with similar countries
- Vanuatu's 1 DB16-20 methodology is below the median for lower middle income countries, which is 2 DB16-20 methodology, 50% of the median. (47 countries reporting)
- Vanuatu's 1 DB16-20 methodology is below the median for East Asia & Pacific, which is 2 DB16-20 methodology, 50% of the median. (28 countries reporting)
Countries ranked near Vanuatu
- 139 Antigua and Barbuda 1 DB16-20 methodology compare
- 139 Burundi 1 DB16-20 methodology compare
- 139 Central African Republic 1 DB16-20 methodology compare
- 139 Dominica 1 DB16-20 methodology compare
- 139 El Salvador 1 DB16-20 methodology compare
- 139 Grenada 1 DB16-20 methodology compare
- 139 Guyana 1 DB16-20 methodology compare
- 139 Haiti 1 DB16-20 methodology compare
- 139 Honduras 1 DB16-20 methodology compare
- 139 Kenya 1 DB16-20 methodology compare
- 139 Kiribati 1 DB16-20 methodology compare
- 139 Malawi 1 DB16-20 methodology compare
- 139 Seychelles 1 DB16-20 methodology compare
- 139 Solomon Islands 1 DB16-20 methodology compare
- 139 South Sudan 1 DB16-20 methodology compare
- 139 Sri Lanka 1 DB16-20 methodology compare
- 139 East Timor 1 DB16-20 methodology compare
- 139 Togo 1 DB16-20 methodology compare
- 139 Trinidad and Tobago 1 DB16-20 methodology compare
- 139 Zambia 1 DB16-20 methodology compare
More private sector data for Vanuatu
- Merchandise trade 43.8% (2025)
- Food imports 25.0% (2011)
- Manufactures imports 52.3% (2011)
- Merchandise imports 515.00 million current US$ (2025)
- Commercial service imports 225.06 million current US$ (2022)
- Food exports 85.3% (2011)
- Manufactures exports 8.2% (2011)
- Merchandise exports 78.00 million current US$ (2025)
- Commercial service exports 74.02 million current US$ (2022)
- Merchandise exports (current US$), per capita 232.72 current US$ per person (2025)
Frequently asked questions
- What is dealing with construction permits: quality control during in Vanuatu?
- Dealing with construction permits: quality control during in Vanuatu was 1 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control during recorded in Vanuatu?
- The highest recorded value was 1 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control during recorded in Vanuatu?
- The lowest recorded value was 1 DB16-20 methodology in 2014.
- How does Vanuatu rank for dealing with construction permits: quality control during?
- Vanuatu ranks 139th out of 186 countries with data for 2019.
- Is dealing with construction permits: quality control during rising or falling in Vanuatu?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Vanuatu data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.